A brief that fits the building
A solution for the actual site, not a stock package of works.
1.3 · A discipline of its own
Floor screed as a discipline of its own, on our own sites and for other general contractors.
We level the substrate, lay damp-proofing and acoustic insulation, reinforce where required and pour the screed to the calculated thickness. The specification follows the covering to come and the loads in service.
Floor screed is a discipline in its own right here. We come onto sites of any size with our own plant and crews and fit into the main construction programme.
We check flatness, moisture and strength before handing over to the next trade, so the covering goes down without defects.
A solution for the actual site, not a stock package of works.
Ten completed buildings of different types.
One contractor at every stage, from the empty site to handover.
Shelters, reconstructions, façade glazing.
As-built documents and approvals without delay.
Cost and programme are fixed before work starts.
Leave a phone number — we will prepare a free cost and programme estimate and call back the same working day.
We work as general contractor and take the building as a whole.
Our projects