How to prepare a base for screed

Screed only lies flat on a prepared base. What is hidden underneath decides how long the floor will last.

Assessing the base

Before work starts we check the strength and moisture of the base, strip weak layers and repair cracks. Without that the new screed will copy the faults of the old one.

Waterproofing and acoustic isolation

On residential and commercial slabs we lay an isolation layer: it takes out impact noise and keeps moisture out of the structure.

Checking the level

We set the level to pins and check it on every bay — a deviation is cheaper to fix before the pour than after.

Planning an industrial building?

We can talk through the structure, the dates and the cost.

Send an enquiry

Read also

Industrial construction

What to consider when building a warehouse or hangar

04.09.2026
Finishing

Interior works in commercial premises

07.08.2026
This site is registered on wpml.org as a development site. Switch to a production site key to remove this banner.