A public-space surface works all year: frost, water and a constant flow of people act on it.
Base
Under pedestrian areas we lay a drainage layer — without it the surface heaves in the first winter.
Materials
For paths and courts we choose the material for the load: from concrete units to surfaces for play areas.
