A school campus combines the demands of safety, services and dates: the building has to open before the school year.
Site and structure
Site preparation and earthworks are sequenced so the concrete can start without a pause — that is the main reserve in the programme.
Services and shelter
Building services and the shelter go in with the structure, not after it.
Handover
Acceptance comes with the full set of as-built documents and approvals.