The general contractor’s role on site

The general contractor is responsible for the building as a whole: from preparing the site to handing it over.

Coordination

The client has one counterpart instead of a dozen crews. Structure, services and finishes are settled inside the team, not at the joints between contractors.

The most expensive mistakes on a site happen not inside a trade, but at the edge between trades.

Documentation

As-built documents are prepared alongside the works, so acceptance does not become a separate stage of several months.

Planning an industrial building?

We can talk through the structure, the dates and the cost.

Send an enquiry